Thursday, December 24, 2020

Report of Mission 60 organized by Habitat Marte - December 11th-23rd 2020.

 Report of Mission 60 organized by Habitat Marte

 

Days: 

December 11th-23rd 2020.

 

Members of the mission:

 

Prof. Julio Rezende (Brazil)

Main Station chief

E-mail: juliofdrezende@hotmail.com.

 

Davi Souza (Brazil)

Powerstation chief

E-mail: daviafs15@gmail.com

 

Lokesh Gurjar (India)

Launch Center chief

E-mail: lokeshgurjar786.lg@gmail.com

 

Deepanshu Mathur (India)

Engineering center chief

E-mail: deepanshumathur96@gmail.com

 

Benedict Nweke (Nigeria)

Health Center chief

E-mail: benedictnweke13@gmail.com

 

Ayomide Atanseiye (Nigeria)

Greenhouse chief

E-mail: atanseiyeayomide@gmail.com

 

 

General objective:

Propose guidelines to operation and management of a Mars habitat.

 

Presentation

Happened the remote space mission simulation 60 organized by Mars analog station Habitat Marte. The mission happened from December 11th to 23rd , 2020. The members of the mission 60 were Prof. Julio Rezende (Brazil), Davi Souza (Brazil), Lokesh Gurjar (India), Deepanshu Mathur (India), Benedict Nweke (Nigeria), Ayomide Atanseiye (Nigeria). The goal of the mission was discuss the management and protocols applied a future space habitat operating in Mars.

 

Activities developed during the mission:

- Watching the launch of SpaceX rocket – Mission 108; 

- Presentations about specific facilities operating in a Mars habitat;

- Live from Habitat Marte;

- Maintenance of the growbeds aquaponic system in Habitat Marte;

- Cultivation of new plants (pepper);

- Painting the walls of Habitat Marte complex;

- Development of new protocols.

 

 

MISSION TIMELINE

Sol 1: December 11th, 2020 (Friday): 

TIME (GMT)

Activities

0h-3h

- Preparation of methodology.

3h-9h

- Resting

9h-11h

- Preparation for the meeting.

- Sending the first messages to the team.

 

Weather in Natal / Rio Grande do Norte/ Brasil

Data: December 11th 2020

Time: 7:44 (Brazil Time)/  10:44 AM GMT

Temperature: 27C

Humidity: 79%

Rain:  4%

Sky: sunny.

11h-12h

- First meeting to explain the Mission.

12h-24h

- Off-line activities.

 

 

Sol 2: December, 12th 2020 (Saturday): 

TIME (GMT)

Activity

0h-9h

- Resting

9h-11h

- Off-line activities.

 

Weather in Natal / Rio Grande do Norte/ Brasil

Data: December 12th 2020

Time: 7:41 (Brazil Time)/  10:41 AM GMT

Temperature: 28C

Humidity: 73%

Rain:  2%

Sky: little cloudy.

11h-12h

Presentation of Prof. Julio Rezende about the Main Station.

12h-24h

Off-line activities.

 

Sol 3: December, 13th  2020 (Sunday): 

TIME (GMT)

Activities

0h-9h

- Resting.

9h-24h

- Off-line activities.

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: December 13th 2020

Time: 17:05 BRT Time, 20h05 GMT 

Temperature: 28C

Humidity: 75%

Rain:  2%

Sky: Cloudy.

 

Sol 4: December 14th, 2020 (Monday): 

TIME (GMT)

Activities

0h-10h

- Resting

10h-12h

- Contacting the crew.

12h-13h

- Presentation of professor Julio Rezende about a main station in Mars.

13h-24h

- off line activities and report writing.

 

Weather in Natal / Rio Grande do Norte/ Brasil

Data: November 30th 2020

Time: 5:55 (Local time)/ 8:55 AM GMT

Temperature: 24C

Humidity: 84%

Rain:  6%

Sky: Partially Cloudy.

 

Sol 5: December 15th, 2020 (Tuesday)

TIME (GMT)

Activities

0h-3h

- Preparing report.

3h-9h

- Resting.

9h-24h

- Off-line activities.

 

Weather in Jabalpur/ Madhya Pradesh/ India

Data: December 15th 2020

Time : 4:00 PM IST and 10:30 AM GMT

Temperature:  23 ℃

Humidity: 59%

Rain : 55%

Sky: Cloudy.

 

Weather in Indore/ Madhya Pradesh/ India

Data: December 15th 2020

Time : 10:30 PM IST and 5:30 PM GMT

Temperature:  22 ℃

Humidity: 89%

Rain : 10%

Sky: Partly Cloudy.

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: December 15th  2020

Time: 17h (Local time)/ 8 PM GMT

Temperature: 27C

Humidity: 76%

Rain: 2 %

Sky: Clear.

 

Sol 6: December, 16th 2020 (Wednesday):

TIME (GMT)

Activities

0h-3

- Writing the report;

3h-7h30m

- Wake up;

7h30m-11h

- Off-line activities.

11h-11h30m

- Presentation of Ayomide about a Greenhouse based in Mars.

11h30m-24h

- Off-line activities.

 

Weather in Indore/ Madhya Pradesh/ India

Data: December 15th 2020

Time : 10:30 PM IST and 5:30 PM GMT

Temperature:  22 ℃

Humidity: 89%

Rain : 10%

Sky: Partly Cloudy

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: December 15th  2020

Time: 17h (Local time)/ 8 PM GMT

Temperature: 27C

Humidity: 76%

Rain: 2 %

Sky: Clear.

 

Sol 7: December, 17th 2020 (Thursday):

TIME (GMT)

Activities

0h-9h

- Resting

9h-24h

- Off-line activities.

 

Weather in Jabalpur/ Madhya Pradesh/ India

Data: December 16th 2020

Time : 5:00 PM IST and 11:30 AM GMT

Temperature:  22 ℃

Humidity: 79%

Rain : 25%

Sky: Haze

 

Weather in Indore/ Madhya Pradesh/ India

Data: December 16th 2020

Time : 5:00 PM IST and 11:30AM GMT

Temperature:  20 ℃

Humidity: 81%

Rain : 4%

Sky: sunny

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: December 17th  2020

Time: 12h16m (Local time)/ 3h16m PM GMT

Temperature: 29C

Humidity: 72%

Rain: 2 %

Sky: Clear.

 

Sol 8: December, 18th 2020 (Friday): 

TIME (GMT)

Activities

0h-9h

- Resting.

9h-11h

- Preparation for the meeting.

11h-13h

- Presentation of 

13h-24h

- Off-line activities.

 

Weather in Jabalpur/ Madhya Pradesh/ India

Data: December 18th 2020

Time : 4:30 PM IST and 11:00 AM GMT

Temperature:  23 ℃

Humidity: 38%

Rain : 0%

Sky: Clear.

 

Weather in Indore/ Madhya Pradesh/ India

Data: December 18th 2020

Time : 4:30 PM IST and 11:00 AM GMT

Temperature:  19℃

Humidity: 55%

Rain : 0%

Sky: Haze.

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: December 18th 2020

Time: 17:30 (Local time)/ 20:30 GMT

Temperature: 28 C

Humidity: 75%

Rain: 2%

Sky: Clear.

 

Sol 9: December, 19th 2020 (Saturday): 

TIME (GMT)

Activities

0h-9h

- Resting.

9h-13h

- Preparation for the meeting.

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: December 19th 2020

Time: 9:45 (Local time)/ 12:45 PM GMT

Temperature: 29 C

Humidity: 69 %

Rain:  4 %

Sky: Clear.

13h-14h

- Presentation about Launch Center by Lokesh Gurjar

13h-13h15m

- Following up the SpaceX launching.

13h15m-24h

- Off-line activities.

 

Sol 10: December, 20th 2020 (Sunday): 

TIME (GMT)

Activities

0h-4h

- Preparation of report.

4h-9h30m

- Resting.

9h30m-12h

 

Habitat Marte, Caiçara do Rio do Vento, Rio Grande do Norte, Brasil.

Time: 07:55 BRT Time. 10:55 AM GMT Time

Temperature: 28 C

Humidity: 58%

Sky: clean.

 

Sol 11: December, 21st  2020 (Monday): 

TIME (GMT)

Activities

0h-4h

- Preparation of report.

4h-10h

- Resting

10h-11h

- Activities in Habitat Marte.

 

Habitat Marte, Caiçara do Rio do Vento, Rio Grande do Norte, Brasil.

Time: 07:55 BRT Time. 10:55 AM GMT Time

Temperature: 28 C

Humidity: 58%

Sky: some clouds.

11h-12h15m

- Presentation of Deepanshu Mathur about Engineering Center and show of Habitat Marte facilities to the participants.

12h15m-14h30m

- Activities in Habitat Marte.

14h30m-16h30m

- Travel from Habitat Marte to Natal.

16h30m-24h

- Off-line activities.

- Writing the report.

 

Sol 5: December 22nd, 2020 (Tuesday)

TIME (GMT)

Activities

0h-3h

- Preparing report.

9h-24h

- Off-line activities.

 

Sol 5: December 23rd, 2020 (Tuesday)

TIME (GMT)

Activities

0h-3h

- Preparing report.

9h-24h

- Off-line activities.

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: December 1st 2020

Time: 6:56 (Local time)/ 9:56 GMT

Temperature: 27C

Humidity: 77 %

Rain:  3%

Sky: Clear.

 

 

Results and final considerations

Happened the remote space mission simulation 60 organized by Mars analog station Habitat Marte. The mission happened from December 11th to 23rd , 2020. The members of the mission 60 were Prof. Julio Rezende (Brazil), Davi Souza (Brazil), Lokesh Gurjar (India), Deepanshu Mathur (India), Benedict Nweke (Nigeria), Ayomide Atanseiye (Nigeria). The goal of the mission was discuss the management and protocols applied a future space habitat operating in Mars.

 

Schedule of CapComs during the mission 60:

CapCom 1: December 11th , 2020 (Friday): 11 AM GMT – Initial meeting.

CapCom 2: December 12th 2020 (Saturday): 

11 AM GMT – Presentation about Main Station – Prof. Julio Rezende.

CapCom 3: December, 14th 2020 (Monday): 

11 AM GMT: Presentation about Power Station by Davi Souza

CapCom 4: December 16th, 2020 (Wednesday):

11 AM GMT: Presentation of Atanseiye Nigeria HABITAT MARTE 60 - Sanitation center or greenhouse.

CapCom 5: December 18th, 2020 (Friday):

11 AM GMT: Presentation about Mars soil simulant research

CapCom 6: December 19th, 2020 (Saturday):11 AM GMT: Presentation of Lokesh about Launch Center

CapCom 7: December , 21st 2020 (Monday):

11 AM GMT: Presentation of Deepanshu about Engineering Center

CapCom 8: December , 23rd 2020 (Tuesday): 11 AM GMT: Last Meeting.

 

More information about the missions and the Habitat Marte can be found at www.HabitatMarte.com. 

Prof. Julio Rezende (main station chief). All videos are available in www.youtube.com/HabitatMarte.

No comments:

Post a Comment

About Habitat Marte Space Analog Station

  Habitat Marte  space analog station station is located in Brazilian semiarid, in rural area of Caiçara do Rio do Vento, 100 km from capita...