Report of Mission 58 organized by Habitat Marte
Days:
November 27th-December 8th, 2020.
Members of the mission:
Prof. Julio Rezende (Brazil)
Main Station chief
E-mail: juliofdrezende@hotmail.com.
Richal Abhang (India)
Sanitation Center chief
E-mail: richalabhang@gmail.com
Ilankuzhali Elavarasan (India)
Greenhouse chief
E-mail: ila09march@gmail.com
Davi Souza (Brazil)
Powerstation Center chief
E-mail: daviafs15@gmail.com
Aravind Karthik (India)
Engineering center chief
E-mail: mak.murali5@gmail.com
General objective:
Propose guidelines to operation and management of a Mars habitat.
Presentation
The remote space mission simulation 58 organized by Mars analog station Habitat Marte happened from November 27th to December 8th, 2020. The members of the mission 58 were Prof. Julio Rezende (Brazil), Richal Abhang (India), Ilankuzhali Elavarasan (India), Davi Souza (Brazil), and Aravind Karthik (India). The goal of the mission It was discuss the management and protocols applied a future space habitat operating in Mars.
Activities developed during the mission:
- Presentations about specific facilities operating in Mars habitat;
- Maintenance of the Deep Water Culture – DWC and growbeds aquaponic systems in Habitat Marte;
- Development of new protocols.
- Attend to Space Habitat Event.
- Evaluate the renovation of Habitat Marte façade.
MISSION ACTIVITIES
Sol 1: November 27th, 2020 (Friday):
TIME (GMT) | Activities |
0h-3h | - Preparation of methodology. |
3h-9h | - Resting |
9h-12h | - Preparation for the meeting. - Sending the first messages to the team in the day |
12h-13h | - First meeting to explain the Mission. |
13h-15h15m | - Preparation to travel to Habitat Marte. |
15h15m-16h15m | - Travel to Habitat Marte |
16h15m-19h45m | - Activities in Habitat Marte. |
19h45m-20h15m | - Travel from Habitat Marte to Natal. |
20h15m-24h | - Off-line activities. |
Sol 2: November, 28th 2020 (Saturday):
TIME (GMT) | Activity |
0h-9h | - Resting |
9h-12h | - Off-line activities.
Weather in Natal / Rio Grande do Norte/ Brasil Data: November 28th 2020 Time: 8:58 (Brazil Time)/ 11:59 AM GMT Temperature: 28C Humidity: 76% Rain: 4% Sky: sunny. |
12h-13h15m | Presentation of Aravind Karthik about engineering center.
Weather in Mumbai/ Maharashtra/ India Data: November 28th 2020 Time: 6.50 pm Temperature: 31 C Humidity: 47% Rain: 0% Sky: Cloudy
Weather in Cuddalore/Tamilnadu/ India Data: November 28th 2020 Time: 16:48 IST/ 11:18 GMT Weatherr:- Temperature: 28°C Humidity: 87% Rain: 70% Sky: Cloudy |
13h15m-24h | Off-line activities. |
Sol 3: November, 29th 2020 (Sunday):
TIME (GMT) | Activities |
0h-9h | - Resting. |
9h-24h | - Off-line activities.
Weather in Cuddalore/Tamilnadu/ India Data: November 29, 2020 Time: 17:44 IST/ 12:14 GMT Weatherr:- Temperature: 29°C Humidity: 74% Rain: 17% Sky: Mostly sunny
Weather in Mumbai/ Maharashtra/ India Data: November 29th 2020 Time: 19.43 PM (IST)/ 2.15 PM GMT Temperature: 31C Humidity: 69% Rain: 2% Sky: Cloudy
Weather in Natal / Rio Grande do Norte/ Brazil Data: November 29th 2020 Time: 17:05 BRT Time, 20h05 GMT Temperature: 28C Humidity: 75% Rain: 2% Sky: Cloudy. |
Sol 4: November 30th, 2020 (Monday):
TIME (GMT) | Activities |
0h-10h | - Resting |
10h-12h | - Contacting the crew. |
12h-13h | - Presentation of professor Julio Rezende about a main station in Mars. |
13h-24h | - off line activities and report writing.
Weather in Natal / Rio Grande do Norte/ Brasil Data: November 30th 2020 Time: 5:55 (Local time)/ 8:55 AM GMT Temperature: 24C Humidity: 84% Rain: 6% Sky: Partially Cloudy. |
Sol 5: December 1st, 2020 (Tuesday)
TIME (GMT) | Activities |
0h-3h | - Preparing report. |
9h-24h | - Off-line activities.
Weather in Natal / Rio Grande do Norte/ Brazil Data: December 1st 2020 Time: 23:07 (Local time)/ 02:07 AM GMT (December 2nd) Temperature: 27C Humidity: 77% Rain: 4% Sky: Clean. |
Sol 6: December, 2nd 2020 (Wednesday):
TIME (GMT) | Activities |
0h-2 | - Writing the report; |
10h | - Wake up; |
10h-12h | - Contacting the crew;
Weather in Cuddalore/Tamilnadu/ India Data: December 2, 2020 Time: 17:15 IST/ 11:45 GMT Weather:- Temperature: 24°C Humidity: 84% Rain: 94% Sky: Thunderstorm |
12h-12h45m | - Presentation of Davi Souza about a Powerstation based in Mars. |
12h15m-24h | - Off-line activities.
Weather in Natal / Rio Grande do Norte/ Brazil Data: December 2nd 2020 Time: 11:12 (Local time)/ 2:12 PM GMT Temperature: 29 C Humidity: 74% Rain: 9% Sky: Cloudy. |
Sol 7: December, 3rd 2020 (Thursday):
TIME (GMT) | Activities |
0h-9h | - Resting |
9h-24h | - Off-line activities. |
Sol 8: December, 4th 2020 (Friday):
TIME (GMT) | Activities |
0h-9h | - Resting. |
9h-12h | - Preparation for the meeting. |
12h-13h | - Presentation of |
13h-24h | - Off-line activities. |
Sol 9: December, 5th 2020 (Saturday):
TIME (GMT) | Activities |
0h-9h | - Resting. |
9h-12h | - Preparation for Space Habitat Event |
12h-19h | - Space Habitat Event |
19h-24h | - Off-line activities |
Sol 10: December, 6th 2020 (Sunday):
TIME (GMT) | Activities |
0h-9h | - Resting. |
9h-12h | - Preparation for Space Habitat Event |
12h-21h | - Space Habitat Event |
21h-24h | - Off-line activities |
Sol 11: December, 7th 2020 (Monday):
TIME (GMT) | Activities |
0h-3h | - Preparation of report. |
3h-10h | - Resting |
10h-12h | - Off-line activities |
12h-12h30m | - Final Meeting |
12h30m-24h | - Preparation of report - Recording video report.
Weather in Natal / Rio Grande do Norte/ Brazil Data: December 7th 2020 Time: 11h40m (Local time)/ 14h40m GMT Temperature: 28 C Humidity: 77% Rain: 7% Sky: Partially cloudy. |
Sol 12: December 8th, 2020 (Tuesday)
TIME (GMT) | Activities |
0h-3h | - Preparing report. |
9h-24h | - Off-line activities.
Weather in Natal / Rio Grande do Norte/ Brazil Data: December 8tht 2020 Time: 7:59 (Local time)/ 10:59 AM GMT Temperature: 27 C Humidity: 81% Rain: 7% Sky: Clean. |
Results and final considerations
The remote space mission simulation 58 organized by Mars analog station Habitat Marte happened from November 27th to December 8th, 2020. The members of the mission 58 were Prof. Julio Rezende (Brazil), Richal Abhang (India), Ilankuzhali Elavarasan (India), Davi Souza (Brazil), and Aravind Karthik (India). The goal of the mission It was discuss the management and protocols applied a future space habitat operating in Mars.
The mission 58 presented the following program:
Sol 1: November 27th , 2020 (Friday): 12 PM GMT – Initial meeting.
Sol 2: November 28th 2020 (Saturday):
12 PM GMT – Presentation of Aravind about Engineering Center
Sol 3: November, 29th 2020 (Sunday): off-line activities
Sol 4: November, 30th 2020 (Monday): 12 PM GMT: Presentation about Main Station by Julio Rezende.
Sol 5: December, 1st , 2020 (Tuesday): off-line activities
Sol 6: December 2nd , 2020 (Wednesday): 12 PM GMT: Presentation of Davi Souza about the Powerstation.
Sol 7: December 3rd, 2020 (Thursday):
Sol 8: December 4th, 2020 (Friday):
11 AM GMT: Presentation of Richal Abhang about Sanitation Center.
Sol 9: December 5th, 2020 (Saturday): 12 PM GMT: Space habitat Event.
Sol 10: December 6th, 2020 (Sunday): 11 AM GMT: Space habitat Event
Sol 11: December , 7th 2020 (Monday): 12 PM GMT: Presentation of Ilankuzhali Elavarasan about greenhouse
Sol 12: December , 8th 2020 (Tuesday): 11 PM GMT: Final Meeting.
More information about the missions and the Habitat Marte can be found at www.HabitatMarte.com. All presentations videos are available in www.youtube.com/HabitatMarte. Prof. Julio Rezende (commander).
No comments:
Post a Comment