Thursday, December 24, 2020

Report of Mission 58 organized by Habitat Marte - November 27th-December 8th, 2020.

 Report of Mission 58 organized by Habitat Marte

 

Days: 

November 27th-December 8th, 2020.

 

Members of the mission:

 

Prof. Julio Rezende (Brazil)

Main Station chief

E-mail: juliofdrezende@hotmail.com.

 

Richal Abhang (India)

Sanitation Center chief

E-mail: richalabhang@gmail.com

 

Ilankuzhali Elavarasan (India)

Greenhouse chief

E-mail: ila09march@gmail.com

 

Davi Souza (Brazil)

Powerstation Center chief

E-mail: daviafs15@gmail.com

 

Aravind Karthik (India)

Engineering center chief

E-mail: mak.murali5@gmail.com

 

General objective:

Propose guidelines to operation and management of a Mars habitat.

 

Presentation

The remote space mission simulation 58 organized by Mars analog station Habitat Marte happened from November 27th to December 8th, 2020. The members of the mission 58 were Prof. Julio Rezende (Brazil), Richal Abhang (India), Ilankuzhali Elavarasan (India), Davi Souza (Brazil), and Aravind Karthik (India). The goal of the mission It was discuss the management and protocols applied a future space habitat operating in Mars.

 

Activities developed during the mission:

- Presentations about specific facilities operating in Mars habitat;

- Maintenance of the Deep Water Culture – DWC and growbeds aquaponic systems in Habitat Marte;

- Development of new protocols.

- Attend to Space Habitat Event.

- Evaluate the renovation of Habitat Marte façade.

 

 


 

MISSION ACTIVITIES

Sol 1: November 27th, 2020 (Friday): 

TIME (GMT)

Activities

0h-3h

- Preparation of methodology.

3h-9h

- Resting

9h-12h

- Preparation for the meeting.

- Sending the first messages to the team in the day

12h-13h

- First meeting to explain the Mission.

13h-15h15m

- Preparation to travel to Habitat Marte.

15h15m-16h15m

- Travel to Habitat Marte

16h15m-19h45m

- Activities in Habitat Marte.

19h45m-20h15m

- Travel from Habitat Marte to Natal.

20h15m-24h

- Off-line activities.

 

Sol 2: November, 28th 2020 (Saturday): 

TIME (GMT)

Activity

0h-9h

- Resting

9h-12h

- Off-line activities.

 

Weather in Natal / Rio Grande do Norte/ Brasil

Data: November 28th 2020

Time: 8:58 (Brazil Time)/  11:59 AM GMT

Temperature: 28C

Humidity: 76%

Rain:  4%

Sky: sunny.

12h-13h15m

Presentation of Aravind Karthik about engineering center.

 

Weather in Mumbai/ Maharashtra/ India

Data: November 28th 2020

Time: 6.50 pm

Temperature: 31 C

Humidity: 47%

Rain:  0%

Sky: Cloudy

 

Weather in Cuddalore/Tamilnadu/ India

Data: November 28th 2020

Time: 16:48 IST/ 11:18 GMT

Weatherr:-

Temperature: 28°C

Humidity: 87%

Rain:  70%

Sky: Cloudy

13h15m-24h

Off-line activities.

 

Sol 3: November, 29th  2020 (Sunday): 

TIME (GMT)

Activities

0h-9h

- Resting.

9h-24h

- Off-line activities.

 

Weather in Cuddalore/Tamilnadu/ India

Data: November 29, 2020

Time: 17:44 IST/ 12:14 GMT

Weatherr:-

Temperature: 29°C

Humidity: 74%

Rain:  17%

Sky: Mostly sunny

 

Weather in Mumbai/ Maharashtra/ India

Data: November 29th 2020

Time: 19.43 PM (IST)/  2.15 PM GMT

Temperature: 31C

Humidity: 69%

Rain:  2%

Sky: Cloudy

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: November 29th 2020

Time: 17:05 BRT Time, 20h05 GMT 

Temperature: 28C

Humidity: 75%

Rain:  2%

Sky: Cloudy.

 

Sol 4: November 30th, 2020 (Monday): 

TIME (GMT)

Activities

0h-10h

- Resting

10h-12h

- Contacting the crew.

12h-13h

- Presentation of professor Julio Rezende about a main station in Mars.

13h-24h

- off line activities and report writing.

 

Weather in Natal / Rio Grande do Norte/ Brasil

Data: November 30th 2020

Time: 5:55 (Local time)/ 8:55 AM GMT

Temperature: 24C

Humidity: 84%

Rain:  6%

Sky: Partially Cloudy.

 

Sol 5: December 1st, 2020 (Tuesday)

TIME (GMT)

Activities

0h-3h

- Preparing report.

9h-24h

- Off-line activities.

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: December 1st 2020

Time: 23:07 (Local time)/ 02:07 AM GMT (December 2nd)

Temperature: 27C

Humidity: 77%

Rain:  4%

Sky: Clean.

 

Sol 6: December, 2nd 2020 (Wednesday):

TIME (GMT)

Activities

0h-2

- Writing the report;

10h

- Wake up;

10h-12h

- Contacting the crew; 

 

Weather in Cuddalore/Tamilnadu/ India

Data: December 2, 2020

Time:  17:15 IST/  11:45 GMT

Weather:-

Temperature: 24°C

Humidity: 84%

Rain:  94%

Sky: Thunderstorm

12h-12h45m

- Presentation of Davi Souza about a Powerstation based in Mars.

12h15m-24h

- Off-line activities.

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: December 2nd 2020

Time: 11:12 (Local time)/ 2:12 PM GMT

Temperature: 29 C

Humidity: 74%

Rain: 9%

Sky: Cloudy.

 

Sol 7: December, 3rd 2020 (Thursday):

TIME (GMT)

Activities

0h-9h

- Resting

9h-24h

- Off-line activities.

 

Sol 8: December, 4th 2020 (Friday): 

TIME (GMT)

Activities

0h-9h

- Resting.

9h-12h

- Preparation for the meeting.

12h-13h

- Presentation of 

13h-24h

- Off-line activities.

 

Sol 9: December, 5th 2020 (Saturday): 

TIME (GMT)

Activities

0h-9h

- Resting.

9h-12h

- Preparation for Space Habitat Event

12h-19h

- Space Habitat Event

19h-24h

- Off-line activities

 

Sol 10: December, 6th 2020 (Sunday): 

TIME (GMT)

Activities

0h-9h

- Resting.

9h-12h

- Preparation for Space Habitat Event

12h-21h

- Space Habitat Event

21h-24h

- Off-line activities

 

Sol 11: December, 7th  2020 (Monday): 

TIME (GMT)

Activities

0h-3h

- Preparation of report.

3h-10h

- Resting

10h-12h

- Off-line activities

12h-12h30m

- Final Meeting

12h30m-24h

- Preparation of report

- Recording video report.

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: December 7th 2020

Time: 11h40m (Local time)/ 14h40m GMT

Temperature: 28 C

Humidity: 77%

Rain: 7%

Sky: Partially cloudy.

 

Sol 12: December 8th, 2020 (Tuesday)

TIME (GMT)

Activities

0h-3h

- Preparing report.

9h-24h

- Off-line activities.

 

Weather in Natal / Rio Grande do Norte/ Brazil

Data: December 8tht 2020

Time: 7:59 (Local time)/ 10:59 AM GMT 

Temperature: 27 C

Humidity: 81%

Rain:  7%

Sky: Clean.

 

Results and final considerations

The remote space mission simulation 58 organized by Mars analog station Habitat Marte happened from November 27th to December 8th, 2020. The members of the mission 58 were Prof. Julio Rezende (Brazil), Richal Abhang (India), Ilankuzhali Elavarasan (India), Davi Souza (Brazil), and Aravind Karthik (India). The goal of the mission It was discuss the management and protocols applied a future space habitat operating in Mars.

 

The mission 58 presented the following program:

Sol 1: November 27th , 2020 (Friday): 12 PM GMT – Initial meeting.

Sol 2: November 28th 2020 (Saturday):

12 PM GMT – Presentation of Aravind about Engineering Center 

Sol 3: November, 29th 2020 (Sunday): off-line activities

Sol 4: November, 30th 2020 (Monday):  12 PM GMT: Presentation about Main Station by Julio Rezende.

Sol 5: December, 1st , 2020 (Tuesday): off-line activities

Sol 6: December 2nd , 2020 (Wednesday): 12 PM GMT: Presentation of Davi Souza about the Powerstation.

Sol 7: December 3rd, 2020 (Thursday): 

Sol 8: December 4th, 2020 (Friday): 

11 AM GMT: Presentation of Richal Abhang about Sanitation Center.

Sol 9: December 5th, 2020 (Saturday):  12 PM GMT: Space habitat Event.

Sol 10: December 6th, 2020 (Sunday): 11 AM GMT: Space habitat Event

Sol 11: December , 7th 2020 (Monday): 12 PM GMT: Presentation of Ilankuzhali Elavarasan about greenhouse

Sol 12: December , 8th 2020 (Tuesday):  11 PM GMT: Final Meeting.

 

More information about the missions and the Habitat Marte can be found at www.HabitatMarte.com. All presentations videos are available in www.youtube.com/HabitatMarte. Prof. Julio Rezende (commander).

No comments:

Post a Comment

Space Habitat Event - July, 1st-3rd 2022 – CALL FOR PAPERS

  Space Habitat Event - July, 1 st -3 rd  2022 – CALL FOR PAPERS Space Habitat Event  is an international event dedicated to debate the oper...